WFP’s support to strengthening the national social protection system in Cambodia
This case study reviews the World Food Programme’s (WFP) support to social protection in Cambodia over the last decade.
30 August 2024
This case study reviews the World Food Programme’s (WFP) support to social protection in Cambodia over the last decade.
30 August 2024
This case study reviews the World Food Programme’s (WFP’s) support to social protection in India, specifically the country’s food and nutrition-focused social protection programmes, since 2014.
30 August 2024
This case study reviews the World Food Programme’s (WFP) support to social protection in the Islamic Republic of Mauritania since the launch of its 2019–2023 Country Strategic Plan.
30 August 2024
IDS Policy Briefing 215
The relationship between infrastructure development and intensifying climate crisis is generating new cycles of 24-hour risks in the urban global South. Research from Karachi and Nairobi points to opportunities to build resilient infrastructures that strengthen and support community networks and...
29 August 2024
IDS Working Paper 612
Extreme heat, altered precipitation patterns, and flooding events, exacerbated by climate change, are changing the nature of 24-hour risk cycles faced by low-income neighbourhoods and informal settlements in the urban global South.
29 August 2024
SSHAP Brief
This brief presents considerations for contextualising and responding to the mpox outbreak in the mining towns of South Kivu province in the Democratic Republic of the Congo (DRC). It focuses on women and children living and working in artisanal and small-scale mining (ASM) areas.
28 August 2024
BASIC Research Research Briefing 3
Drawing on our work on the conflict which began in Tigray, Ethiopia in late 2020, and spread to neighbouring regions in 2021, this research briefing summarises new evidence that shows how social assistance and humanitarian aid can work together to protect households from the impact of conflict.
28 August 2024
IDS Working Paper 611
Ce document de travail présente les résultats d'une évaluation basée sur une théorie intégrée d'une initiative participative de construction de la paix mise en oeuvre dans les cercles de Djenné et de Mopti au Mali dans le cadre du projet Vestibule de la Paix.
27 August 2024
IDS Working Paper 610
This Working Paper presents the findings from an embedded theory-based evaluation of a participatory peace-building initiative implemented in the Djenné and Mopti cercles in Mali as part of the ‘Vestibule of Peace’ project.
27 August 2024
IDS Working Paper 609
Cet article présente les résultats d’une recherche d’évaluation intégrée d’une intervention participative de consolidation de la paix à Kangaba, au Mali, au sein du projet « Vestibule de la paix ».
27 August 2024
IDS Working Paper 608
This paper presents the findings from an embedded theory-based evaluation of a participatory peace-building initiative implemented in the Kangaba region of Mali as part of the ‘Vestibule of Peace’ project.
27 August 2024
BASIC Research Working Paper 29
Intersecting inequalities exacerbate the negative impacts of crises on marginalised people’s lives. Yet there is a gap in knowledge about the layered effects of marginalisation and protracted crises, what this means for how those with pressing needs cope and access social assistance in...
21 August 2024